top of page

YOUR RELIABLE
MECHANICAL INSTALLATION PARTNER
FOR WATER INDUSTRY

Temporary stoplogs for channel isolation.

ABOUT

Wattec Engineering Sdn. Bhd. incorporated in 2019, specializes in water, wastewater and water related engineering industry. Wattec is a installation service provider for:

Flow control equipment such as  Penstocks,  Stoplogs, River Gates (Roller Gate, Tidal Control Gate, Radial Gate)

Solid separation equipment such as Rotating Band Screen, Mechanical Trash Rake and Centreflow Screen

Various Mechanical Works such as Piping works, Submersible Pumps, Split Casing Pumps and other water related equipment.

Our vast experience of working in water industry has rooted the company deeply, and strongly believe in the slogan of “Clean & Sustainable Future

MISSION

To be the reliable and innovative engineering solutions provider with achieving the global standards from time to time.

VISION

A clean and sustainable future of water provision for everyone.

ABOUT
PROJECT

PROJCT GALLERY

COMPLETED PROJECTS

Sultan Iskandar Raw Water Intake (2023-2024)

Mechanical installation of intake Tee Screens with air burst systems, DN1200 cast-in pipes with Butterfly Valves and Knife Gate Valves, Penstocks, Submersible Pumps with riser pipes and manifold, desludging system and cold water system.

Tasek Maju Treated Water Pumping Station (2024)

Mechanical installation of split casing pumps, with piping and accessories, flowmeter and steel works within pump house perimeter.

Sultan Iskandar Water Treatment Plant (2022-2023)

Assisting in completion for installation of 2 nos Filters with underdrain, Clarifier stilling plates, weir overflow plates, Aerator static mixer, stoplogs, compressed air piping and water sampling piping.

Tun Razak Exchange - SMART Tilting Gate (2021-2022)

Installation of 2 nos 8000mm (W) x 2500mm (H) tilting gates with cast-in seals. 

Taman Sri Muda Automated Trash Rake (2022)

Installation of 2 nos 6000mm (W) x 8000mm (H) automated trash rake with conveyor system.

Kampung Rantau Panjang Tidal Gates (2022)

Installation of 2 nos 1600mm (W) x 1600mm (H) gearbox operated tidal gates.

Classic Palm Oil Biogas System (2021)

Installation of biogas system onto existing boiler with piping works.

Kuala Linggi Tidal Control Gate Reinstatement Works (2021)

Replacement of gate rubber seals and backing plates.

Sungai Rambai Tidal Control Gate Reinstatement Works (2020)

Dismantling of old gate guide, installation of new duplex gate guide, installation of new 2000mm (W) x 3000mm (H) duplex roller gate, replacement of wire rope and commissioning.

Parit Kanan Tidal Control Gate Reinstatement Works (2020)

Dismantling of old gate guide, installation of new duplex gate guide, refurbishment of existing 3000mm (W) x 3000mm (H) aluminium roller gate and reinstallation.

Semabok Perdana Flow Control Gate (2020)

Dismantling of old gate guide, installation of new duplex gate guide, installation of new 1500mm (W) x 1500mm (H) gearbox operated screw down gate and commissioning.

Pengerang Deepwater Terminal Penstocks (2020)

Installation of 2 nos actuator operated stainless steel penstock with size 2000mm (W) x 2000mm (H) and 1000mm (W) x 2000mm (H).

Track 4A 1440MW CCGT Project (2019 - 2020)

Mechanical installation of 3 nos sewage pump sumps, stormwater pumping system, coldwater plumbing and hot water piping works. 

CONTACT

Head Office

WATTEC ENGINEERING SDN. BHD. (1318384-A)

23-01 Jalan Rosmerah 2/2

Taman Johor Jaya, Johor Bahru, Johor

Malaysia.

HP: (+60)12-6680 189 (Mr. Saw)

Email: admin@watteceng.com

  • Instagram
bottom of page